Category Archives: News
POSITION : PART TIME ENGINEER
Part time MUA Engineer Position The Township of Hillsborough Municipal Utilities Authority (TTHMUA) operates and maintains over 170 miles of gravity sanitary sewer ranging from 8-inch diameter to 36-inch diameter pipe, over 14 miles of force mains and 17 sewage … Continue reading
MAIL SLOT FOR PAYMENTS
For your convenience, 24/7, enveloped payments may be placed in our mail slot. This slot is located in the glass to the right of our entrance door at 220 Triangle Road, Suite 234, within the CVS Shopping Center.
IMPORTANT NOTICE – I&I INFLO – SUMP PUMP
IMPORTANT NOTICE Each year millions of gallons of rain water are improperly drained into the sanitary sewer system. This is caused by sump pumps, floor drains and roof leader drains. One sump pump can discharge water into the sewer … Continue reading
Hillsborough MUA Holiday Observations
The Township of Hillsborough MUA will be closed in observance of the following Holidays:::: *January 1st – New Year’s Day 3rd Monday in January – Martin Luther King Day *February 12 – Lincoln’s Birthday 3rd Monday in February – President’s … Continue reading
No Post Dated Checks Accepted
The Township of Hillsborough MUA cannot accept postdated checks. The bank will not accept postdated checks and we can not hold onto payments for more than 24 hours. Any questions please contact our office at 908-371-9660.
FYI – Safe Disposal of Expired/Unused Medication
There is a national initiative to collect unused or expired medication for safe and proper disposal. Please take this opportunity to dispose of your unused or expired medication at the designated locations listed on the DEA website. The website is … Continue reading